This project consisted of removing all of the original elements of the sanctuary that were damaged when the church was struck by lightning and caught fire. The sanctuary floor was poured back in concrete, the roof frame was replaced and a new roof installed. All new interior finishes installed in the sanctuary. Stained glass windows were restored and replaced back to original conditions. Custom woodwork was recreated to original conditions. A reproduction fiberglass steeple was installed in place of the original masonry bell tower. All new electrical and HVAC systems.
Get your project started today.
Client Name:
Hoyleton Zion Evangelical Church of Christ
Project Size:
Size: 2,400 SF
Project Cost:
$1,300,000
Project Duration:
13 Months
Architect:
Michael L Ewald Architect LLC